Mueller CF Panel Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Dla domu Mueller CF Panel. Mueller CF Panel User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - CF PANEL

METALROOFINGINSTALLATIONGUIDECF PANELMANUAL

Strona 2 - TABLE OF CONTENTS

10PRODUCT DESCRIPTION• 12" Coverage• 26 GaugeFor color selections,please request a color chart.Galvalume Plus (20 Yr. WARRANTY)Limited Paint Warr

Strona 3 - Flashing

Details are subject to change without prior notice.11STANDARD FASTENER LOCATIONS AT PANELWARNING! Mueller trim comeswith a protective film coating toa

Strona 4 - SAFETY CONSIDERATIONS

RECOMMENDED SCREW PLACEMENT TABLEDetails are subject to change without prior notice.Note: If using treated lumber, special corrosive resistant screws

Strona 5 - Wall and Roof Panels

INSTALLATION12"Oil Canning Reduction Trim on CF PanelOIL CANNINGWhat is Oil Canning?Oil canning is described as a wavy appearance oftenoccurring

Strona 6 - TOOLS REQUIRED

14Details are subject to change without prior notice.DETAIL LOCATOR147283596DETAIL SECTION Page1 Eave . . . . . . . . . . . . . . . . . . . . . .152 G

Strona 7 - STANDARD PARTS

1. Install the eave trim by sliding it underneath the underlayment and securing it to the roof surface withwafer head screws on 5’ centers.2. There ar

Strona 8

16STANDARD EAVE TRIM INSTALLATION WITH GUTTERDetails are subject to change without prior notice.1. Install the eave trim to the substrate with wafer h

Strona 9

1. Starting at the corner, install the adjustable gable trim along the sloping gable,placing it on top of the underlayment.2. Attach with wafer head s

Strona 10 - PRODUCT DESCRIPTION

18STARTING AND ENDING PANEL INSTALLATIONDetails are subject to change without prior notice.Starting Panel1. Apply adjustable strip as previously instr

Strona 11 - TYPE 2: FASTENER LOCATION

19HIGH SIDE RESIDENTIAL EAVE TRIM INSTALLATIONDetails are subject to change without prior notice.1. Attach the high side trim (#0803) to the fascia wi

Strona 12

TABLE OF CONTENTS2Preparation Requirements and Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Safety Considerations . . . .

Strona 13 - 0.35”0.35”

20VALLEY PANEL AND TRIM INSTALLATIONDetails are subject to change without prior notice.1. Start at the low end, trim and place the valley flashing. Th

Strona 14 - DETAIL LOCATOR

STANDARD RIDGE ROLL and HIP INSTALLATIONDetails are subject to change without prior notice.1. Lay a piece of the #0221 ridge roll or hip in position,

Strona 15 - BEGINNING THE PROJECT

22ENDWALL TO ROOF FLASHING INSTALLATIONDetails are subject to change without prior notice.1. Insert the endwall flashing (#0725) behind the existing w

Strona 16

1. Apply butyl tape to the bottom side of the J-closure.2. Install the J-closure flush with the outer edge of the sidewall flashing and parallel to th

Strona 17

1. Apply lower panels.2. Install the transition flashing (#1487) making sure the bottom portion of the flashing is at the same pitchas the lower panel

Strona 18 - Ending Panel

1. Ensure the lower panel is installed completely (except for the top fasteners).2. Using duckbill pliers squeeze the top 10” of the male side of the

Strona 19

The uphill flashing will be 4” wider than the width of thecurb (2” on each side). Cut an 1/8” slot in the two uphillcorners of the panel slightly wide

Strona 20

27CHIMNEY INSTALLATIONDetails are subject to change without prior notice.CHIMNEY FLASHING - SIDEFLASHING - VENTProcedures:1. Trim the opening in the f

Strona 21

Mueller’s #1, 26 gauge, CF Panelshave received the Underwriter’sLaboratory UL2218 ApprovedClass 4 Premium RatingM-CFMANUAL-REV.11/12FIND OUT MORE ABOU

Strona 22

This detail & installation manual has been provided to serve as a basic guideline for installing the Mueller CF panel roof system.This manual shou

Strona 23

As with all major construction projects, safety should be a primary concern. The erector or contractor should be surethat all OSHA safety rules are fo

Strona 24

Delivery: Mueller takes every precaution to ensure that material is delivered to the customer damage-free and fully protected fromthe elements during

Strona 25 - STANDARD PANEL ENDLAP

6STORAGEStorage: It is recommended that sheets be kept coveredand out of the elements if at all possible. If sheets are tobe stored outside, the follo

Strona 26 - CHIMNEY INSTALLATION

7STANDARD PARTSDetails are subject to change without prior notice.Note: If using treated lumber, specialcorrosive resistant screws are required.Ask yo

Komentarze do niniejszej Instrukcji

Brak uwag